2021~2024年 大気汚染防止設備の納入実績
本文

| CLIENT | PROJECT NAME | FACILITY DETAILS | CONSTRUCTION DATE |
| Korea East-West Power | Dangjin Thermal Power Units 9 and 10 Tripper Room | Design, fabrication and installation of spatial dust removal facilities | 2024 |
| Korea East-West Power | Dangjin Thermal Power Units 1 and 2 Tripper Room | Design, fabrication and installation of spatial dust removal facilities | 2024 |
| HD HYUNDAI OIL BANK | DCU Coke Pit Air Pollution Prevention Facility | Design, manufacture, and deliver automatic opening/ closing Roof Door Wet Scrubber | 2024 |
| HD HYUNDAI OIL BANK | SAR Process NOx Reduction Facility (Ozone Oxidation Facility) | Design, fabricate, and install the O3 Generator Package | 2024 |
| HD HYUNDAI OIL BANK | #2 RTO Odor Improvement | Heat exchanger, adsorption tower design, fabrication, installation | 2024 |
| HYUNDAI OIL BANK | #3, #9 Dry sodium bicarbonate desulfurization equipment | Dry reactor, bag filter design, fabrication, delivery | 2023 |
| HYUNDAI OIL BANK | #10 Dry sodium bicarbonate desulfurization equipment | Design, production, and delivery of sodium bicarbonate injection equipment | 2023 |
| HYUNDAI OIL BANK | #3, #9 Dry sodium bicarbonate desulfurization equipment mill | Sodium bicarbonate mill design, production, delivery | 2023 |
| GS Donghae Electric Power | Coal-fired power plant (560 MW) Tripper Room | Design, fabrication and installation of spatial dust removal facilities | 2023 |
| SEOHAE GREEN ENERGY | Fly Ash Silo, Reagent Silo | Silo, Ash Handling System design, production, installation | 2023 |
| SEOHAE GREEN ENERGY | SCR catalyst | SCR catalyst replacement | 2023 |
| CHOSUN REFRACTORIES ENG | Yeonggwang SRF combined heat and power plant (9.9 MW) denitrification facility | SNCR design, fabrication, installation | 2023 |
| HANIL CHEMICAL IND | AZO dust collection facility | Design, fabrication and installation of bag filters | 2023 |
| SY ENERGY | Replacement of Wet ESP internals | Design, fabrication and installation of Wet ESP | 2022 |
| SY ENERGY | Replacement of Goseong Wet ESP internals | Design, fabrication and installation of adsorption tower | 2022 |
| GEUMDANG | Integrated Environmental Facilities | Design, fabrication and installation of adsorption tower | 2022 |
| JAEWON INDUSTRIAL | SCR catalyst delivery | SCR catalyst replacement | 2022 |
| HYUNDAI OIL BANK | DCU Coke Pit environment improvement service | Environmental Improvement Measures Service | 2022 |
| TONGYANG ECO | Seosan Branch Air Pollution Prevention Facility | SCR design, manufacturing, and installation | 2021 |
| HANIL CHEMICAL IND | Zinc oxide collection equipment | Dust collecting equipment for zinc oxide collection facilities (30 units) | 2021 |
| KOREA EAST-WEST POWER | Donghae Biomass Fuel New Storage Facility | Design, fabrication and installation of spatial dust removal facilities | 2021 |